Case studies
Peterborough Hospital
Peterborough Hospital expanded its estates to accommodate the winter pressures.
Dinas Powys Primary School
Dinas Powys school identified a new classroom block was required to replace existing classrooms at the school.
Park Lane SEN School
Park Lane needed a classroom and a toilet block for the expansion of their school.
Willow Dene Sixth Form Building
With the growing number of students, Willow Dene needed a secure and safe space to accommodate the attendees of the school.
Ysgol Caer Elen
Discover how we have supported Ysgol Caer Elen with their accommodation needs through the construction of a bespoke 4-classroom block.
George Eliot Hospital Theatre
HBN and HTM compliant 30-bed modular building delivered with twin operation theatres for George Eliot Hospital.
Bishop Rawstorne School
Learn more about how Wernick Buildings supported Bishop Rawstorne School with their SEN classroom expansion.
Forest Research Centre
The Forestry Commission's Forest Research division sought new office accommodation to replace their leased space outside of Edinburgh.
Swansea training facility
The training facility needed to enhance the overall sports centre for teams who regularly train on the football pitches.



















