Case Studies

Wernick Power Solutions generators and fuel tank at case study at Lancashire
ConstructionUtilities

HV Upgrade – Lancashire

The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.

Wernick Power Solutions generator hire at Allendale Sewage Treatment Works
Utilities

JN Bentley – Allendale Sewage Treatment Works

Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.

Flybrid at Momentm Health Cambridge
Healthcare

Momentm Health MRI and Diagnostics

Momentm Health, an independent diagnostics provider based in South Cambridgeshire required an upgraded power supply that would meet regulatory standards and support the advanced demands of MRI operations.

St Katherines School
Education

St Katherines School

St Katherines School, a popular academy and nursery located in Harlow, required immediate temporary power and accommodation due to a RAAC issue.

Wernick Power Solutions and Greener Power Solutions at Norfolk Necton
EducationUtilities

Norfolk Project

A hybrid power solution to maintain a range of site facilities, and necessitate continuous fuel supply and refuelling needs throughout the project's duration whilst silently running at night.

Wernick Power Solutions generator, voltbank and fuel store at Clyde Marine
Utilities

Clyde Marine Harbour

Clyde Marine, a dynamic provider of top-tier marine services, sought a way to reduce both their white diesel consumption and carbon emissions.

Wernick Power Solutions instalment of Battery Storage Unit at Student Roost
Education

Student Roost

A purpose-built student accommodation block benefitted incredibly from a Stage V generator and a Battery Storage Unit in Bristol City Centre.

Wernick Power Solutions 300kVA generator
Construction

Cox Construction

Whilst understanding the high current demands of the chillers at the microchip manufacturing facility, a proposed deployment of three 300kVA generators, and a Flybrid technology system was scheduled to maintain the power during the 4 week maintenance shutdown.

Construction

Seddon Construction – The Moorings

Construction

Bellway Homes – The Academy

Education

Reddish Vale – Fallowfield Campus