Student Roost

Wernick Power Solutions instalment of Battery Storage Unit at Student Roost

Challenge

Student Roost, a purpose-built student accommodation block with two attached commercial units is in a prominent city centre location. The client faced issues as the commercial units were not yet connected to the grid. As the project nears completion and the electrical equipment begins to be installed, the electrical contractor is unable to test the medical equipment for safe use. Student Roost were therefore facing a potential delay in opening the brand-new facility creatin a delay in revenue on all sides. The client required temporary power, as quiet as possible in a city centre location with little to no HGV access.

  • Project name: Student Roost
  • Sector: Education
  • Location: Bristol
  • Solution provided: Stage V generator & Voltbank
  • Features: Reduced fuel consumption, reduced Co2 emissions & silent running hours in a residential area

Solution

Wernick Power Solutions suggested a Stage V generator, along with a battery storage unit programmed for silent running hours, a key objective for Student Roost. Additionally, Wernick proposed electrical install to their distribution board and fuel management to eliminate any contractor downtime foe or delays.

Wernick Power Solutions instalment of Battery Storage Unit at Student Roost

Result

From account opening to delivery, Student Roost received a linear and smooth service throughout. The hybrid set up aligned with the noise requirement and served no issues regarding pollution or interference for students. Overall, the client saved £3,029 and avoided 13,952kg of carbon emissions. In addition, Student Roose preserved 4,276 litres of fuel, and achieved 946 hours silent running hours with a sum of 90% of the operation time being silent.

 

Wernick Power Solutions installing Battery Storage Unit at Student Roost

“Thank you for supporting us to arrange power to our commercial unit in a short period of time. Your team were fantastic – visited site and gave us the clear options available, walked us through the process and gave us an overview of the equipment. Wernick have been really helpful at every step, answering any questions we have and offering support. We have lots of new buildings going up over the coming years and because of the service provided, I look forward I look forward to recommending your services.”
Sophie Burgess, Assistant Operations Manager at Student Roost