Case studies

We have over 90 years proven success delivering projects over many sectors.

Image of 15 bay modular building
Construction

Modular welfare facilities for Wisley Acres development

Wernick AVDanzer delivered a bespoke two-storey modular facility designed to provide welfare, office space and viewing platforms for Taylor Wimpey’s Wisley Acres development.

Construction

Caddick Construction – Stone Yard

Wernick Hire delivered a phased, four-storey AVflex modular complex for Caddick Construction at the Stone Yard development in Digbeth. The 46-bay solution, featuring a central staircase and third-floor walkway with a viewing platform, provided high-quality office and welfare facilities that evolved with the growing site team.

Industrial

TATA Steel Invictus

Modular facilities delivered at scale to support a major industrial transformation. Providing high-quality workspace and welfare environments at the heart of Tata Steel’s transition to electric arc steelmaking.

EducationSEN

Little Heath School

Modular SEN school building delivered at Little Heath School, providing accessible, BB104-compliant classrooms and specialist spaces in a modern learning environment.

Image of a refurbished modular building with blue featured wall
InfrastructureUtilities

Refurbished modular offices and welfare for YTLC

By choosing to refurbish and reuse their existing modular building stock, YTL Construction significantly reduced the environmental impact typically associated with new manufacturing.

Wernick Power Solutions generators and fuel tank at case study at Lancashire
ConstructionUtilities

HV Upgrade – Lancashire

The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.

EducationModHire

Tolworth Girls School

Seamless temporary accommodation delivered on time, keeping teaching and learning uninterrupted throughout essential roof replacement works.

InfrastructureUtilities

Tilbury Douglas – Chipping Norton STW

Wernick Hire supplied a factory-finished 3 on 3 AVflex modular complex for Tilbury Douglas at Chipping Norton STW, providing branded, high-quality office and welfare space for a three-year programme. Through Wernick Hire Total, foundations, air conditioning, fire alarms, and vermin skirting were delivered as one coordinated package to ensure a streamlined installation.

Specialist

Midlands Air Ambulance

A carefully integrated modular expansion that enhances crew welfare, public engagement and long-term adaptability for Midlands Air Ambulance.

Wernick Power Solutions generator hire at Allendale Sewage Treatment Works
Utilities

JN Bentley – Allendale Sewage Treatment Works

Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.

Events

The Grand National – RestPod Accommodation

Wernick Events supplied 43 RestPods, along with toilets, showers, and offices, to support crew welfare at the Grand National. Installed in just two days, the comfortable, en-suite units were well-received and delivered with flexibility and precision.