Case studies
We have over 90 years proven success delivering projects over many sectors.
GRAHAM – Stratford Mills
Wernick Hire supplied a triple-storey FMflex accommodation complex for GRAHAM at Stratford Mills, providing offices, welfare facilities, and catering space for more than 300 operatives. The bespoke solution, including fire alarms and emergency lighting, delivered a compliant and efficient working environment throughout the project.
Refurbished office and welfare facilities for JDR Cables
By choosing a refurbished modular building, JDR Cables benefited from a sustainable accommodation solution with lower embodied carbon compared to a new modular building.
Refurbished modular building supports Network Rail operations
Wernick refurbished Network Rail's existing modular building and transformed it into a new facility for their on-site team.
Modular welfare facilities for Wisley Acres development
Wernick AVDanzer delivered a bespoke two-storey modular facility designed to provide welfare, office space and viewing platforms for Taylor Wimpey’s Wisley Acres development.
Caddick Construction – Stone Yard
Wernick Hire delivered a phased, four-storey AVflex modular complex for Caddick Construction at the Stone Yard development in Digbeth. The 46-bay solution, featuring a central staircase and third-floor walkway with a viewing platform, provided high-quality office and welfare facilities that evolved with the growing site team.
TATA Steel Invictus
Modular facilities delivered at scale to support a major industrial transformation. Providing high-quality workspace and welfare environments at the heart of Tata Steel’s transition to electric arc steelmaking.
Little Heath School
Modular SEN school building delivered at Little Heath School, providing accessible, BB104-compliant classrooms and specialist spaces in a modern learning environment.
Refurbished modular offices and welfare for YTLC
By choosing to refurbish and reuse their existing modular building stock, YTL Construction significantly reduced the environmental impact typically associated with new manufacturing.
HV Upgrade – Lancashire
The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.
Tolworth Girls School
Seamless temporary accommodation delivered on time, keeping teaching and learning uninterrupted throughout essential roof replacement works.
Tilbury Douglas – Chipping Norton STW
Wernick Hire supplied a factory-finished 3 on 3 AVflex modular complex for Tilbury Douglas at Chipping Norton STW, providing branded, high-quality office and welfare space for a three-year programme. Through Wernick Hire Total, foundations, air conditioning, fire alarms, and vermin skirting were delivered as one coordinated package to ensure a streamlined installation.



















