Case studies
We have over 90 years proven success delivering projects over many sectors.
Modular welfare facilities for Wisley Acres development
Wernick AVDanzer delivered a bespoke two-storey modular facility designed to provide welfare, office space and viewing platforms for Taylor Wimpey’s Wisley Acres development.
Caddick Construction – Stone Yard
Wernick Hire delivered a phased, four-storey AVflex modular complex for Caddick Construction at the Stone Yard development in Digbeth. The 46-bay solution, featuring a central staircase and third-floor walkway with a viewing platform, provided high-quality office and welfare facilities that evolved with the growing site team.
TATA Steel Invictus
Modular facilities delivered at scale to support a major industrial transformation. Providing high-quality workspace and welfare environments at the heart of Tata Steel’s transition to electric arc steelmaking.
Little Heath School
Modular SEN school building delivered at Little Heath School, providing accessible, BB104-compliant classrooms and specialist spaces in a modern learning environment.
Refurbished modular offices and welfare for YTLC
By choosing to refurbish and reuse their existing modular building stock, YTL Construction significantly reduced the environmental impact typically associated with new manufacturing.
HV Upgrade – Lancashire
The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.
Tolworth Girls School
Seamless temporary accommodation delivered on time, keeping teaching and learning uninterrupted throughout essential roof replacement works.
Tilbury Douglas – Chipping Norton STW
Wernick Hire supplied a factory-finished 3 on 3 AVflex modular complex for Tilbury Douglas at Chipping Norton STW, providing branded, high-quality office and welfare space for a three-year programme. Through Wernick Hire Total, foundations, air conditioning, fire alarms, and vermin skirting were delivered as one coordinated package to ensure a streamlined installation.
Midlands Air Ambulance
A carefully integrated modular expansion that enhances crew welfare, public engagement and long-term adaptability for Midlands Air Ambulance.
JN Bentley – Allendale Sewage Treatment Works
Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.