Case studies

Oakleigh Depot
Offices

Oakleigh Road Depot

A new staff welfare facility was needed due to increase in operational requirements and additional staff. Dedicated service rooms are needed as the existing depot building does not provide this.

Healthcare

Peterborough Hospital

Peterborough Hospital expanded its estates to accommodate the winter pressures.

Education

Dinas Powys Primary School

Dinas Powys school identified a new classroom block was required to replace existing classrooms at the school.

Park Lane Exterior SEN School
Education

Park Lane SEN School

Park Lane needed a classroom and a toilet block for the expansion of their school.

Southmead modular offices
HealthcareOffices

Southmead Hospital executive offices

Wernick delivered urgently needed offices to Southmead Hospital in Bristol to free up bed space before winter.

Education

Ysgol Caer Elen

Discover how we have supported Ysgol Caer Elen with their accommodation needs through the construction of a bespoke 4-classroom block.

Healthcare

George Eliot Hospital Theatre

HBN and HTM compliant 30-bed modular building delivered with twin operation theatres for George Eliot Hospital.

Education

Bishop Rawstorne School

Learn more about how Wernick Buildings supported Bishop Rawstorne School with their SEN classroom expansion.

Forest Research Centre
OfficesSpecialist

Forest Research Centre

The Forestry Commission's Forest Research division sought new office accommodation to replace their leased space outside of Edinburgh.

Swansea training facility
Leisure

Swansea training facility

The training facility needed to enhance the overall sports centre for teams who regularly train on the football pitches.

Excalibur School exterior
Education

Excalibur School

Learn more about our recent case study with Excalibur School and discover how Wernick Buildings could accommodate their needs.