Case studies
Oakleigh Road Depot
A new staff welfare facility was needed due to increase in operational requirements and additional staff. Dedicated service rooms are needed as the existing depot building does not provide this.
Peterborough Hospital
Peterborough Hospital expanded its estates to accommodate the winter pressures.
Dinas Powys Primary School
Dinas Powys school identified a new classroom block was required to replace existing classrooms at the school.
Park Lane SEN School
Park Lane needed a classroom and a toilet block for the expansion of their school.
Southmead Hospital executive offices
Wernick delivered urgently needed offices to Southmead Hospital in Bristol to free up bed space before winter.
Ysgol Caer Elen
Discover how we have supported Ysgol Caer Elen with their accommodation needs through the construction of a bespoke 4-classroom block.
George Eliot Hospital Theatre
HBN and HTM compliant 30-bed modular building delivered with twin operation theatres for George Eliot Hospital.
Bishop Rawstorne School
Learn more about how Wernick Buildings supported Bishop Rawstorne School with their SEN classroom expansion.
Forest Research Centre
The Forestry Commission's Forest Research division sought new office accommodation to replace their leased space outside of Edinburgh.