Case studies

Education

Willow Dene Sixth Form Building

With the growing number of students, Willow Dene needed a secure and safe space to accommodate the attendees of the school.

Langley School
Education

Langley School

Langley School urgently needed a dedicated space for their SEN students - learn how Wernick Buildings supported them.

All Hallows Catholic School
Education

All Hallows Catholic School

All Hallows Catholic School needed a new building to house students for their GCSE, A-level and assessment exams.

Offices

Martin Baker

Martin Baker required a brand new custom facility to replace the existing building and also wished to utilise the opportunity to also expand their office and laboratory space within their estate.

Southmead modular offices
HealthcareOffices

Southmead Hospital executive offices

Wernick delivered urgently needed offices to Southmead Hospital in Bristol to free up bed space before winter.

Oakleigh Depot
Offices

Oakleigh Road Depot

A new staff welfare facility was needed due to increase in operational requirements and additional staff. Dedicated service rooms are needed as the existing depot building does not provide this.

Healthcare

Peterborough Hospital

Peterborough Hospital expanded its estates to accommodate the winter pressures.

Education

Dinas Powys Primary School

Dinas Powys school identified a new classroom block was required to replace existing classrooms at the school.

Park Lane Exterior SEN School
Education

Park Lane SEN School

Park Lane needed a classroom and a toilet block for the expansion of their school.

Education

Ysgol Caer Elen

Discover how we have supported Ysgol Caer Elen with their accommodation needs through the construction of a bespoke 4-classroom block.

Healthcare

George Eliot Hospital Theatre

HBN and HTM compliant 30-bed modular building delivered with twin operation theatres for George Eliot Hospital.