Case studies

Industrial

TATA Steel Invictus

Modular facilities delivered at scale to support a major industrial transformation. Providing high-quality workspace and welfare environments at the heart of Tata Steel’s transition to electric arc steelmaking.

EducationSEN

Little Heath School

Modular SEN school building delivered at Little Heath School, providing accessible, BB104-compliant classrooms and specialist spaces in a modern learning environment.

Specialist

Midlands Air Ambulance

A carefully integrated modular expansion that enhances crew welfare, public engagement and long-term adaptability for Midlands Air Ambulance.

Specialist

Bristol Airport

Rapid-deploy modular boarding gates for Bristol Airport – efficient, high-capacity, and live-site ready.

Education

St Philip’s School

Wernick Buildings delivered a 22-module vocational centre for St Philip’s School, providing specialist classrooms and workshops with minimal disruption and maximum sustainability.

Education

Elmwood School

Wernick Buildings have supplied two modular classroom buildings at Elmwood School.

Southmead modular building office
HealthcareOffices

Southmead Hospital executive offices

Wernick delivered urgently needed offices to Southmead Hospital in Bristol to free up bed space before winter.

Langley School
Education

Langley School

Langley School urgently needed a dedicated space for their SEN students - learn how Wernick Buildings supported them.

All Hallows Catholic School
Education

All Hallows Catholic School

All Hallows Catholic School needed a new building to house students for their GCSE, A-level and assessment exams.

CommercialOffices

Martin Baker

Martin Baker required a brand new custom facility to replace the existing building and also wished to utilise the opportunity to also expand their office and laboratory space within their estate.

Oakleigh Depot
Offices

Oakleigh Road Depot

A new staff welfare facility was needed due to increase in operational requirements and additional staff. Dedicated service rooms are needed as the existing depot building does not provide this.