Case studies

We have over 90 years proven success delivering projects over many sectors.

Image of a refurbished modular building with blue featured wall
InfrastructureUtilities

Refurbished modular offices and welfare for YTLC

By choosing to refurbish and reuse their existing modular building stock, YTL Construction significantly reduced the environmental impact typically associated with new manufacturing.

Wernick Power Solutions generators and fuel tank at case study at Lancashire
ConstructionUtilities

HV Upgrade – Lancashire

The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.

EducationModHire

Tolworth Girls School

Seamless temporary accommodation delivered on time, keeping teaching and learning uninterrupted throughout essential roof replacement works.

InfrastructureUtilities

Tilbury Douglas – Chipping Norton STW

Wernick Hire supplied a factory-finished 3 on 3 AVflex modular complex for Tilbury Douglas at Chipping Norton STW, providing branded, high-quality office and welfare space for a three-year programme. Through Wernick Hire Total, foundations, air conditioning, fire alarms, and vermin skirting were delivered as one coordinated package to ensure a streamlined installation.

Specialist

Midlands Air Ambulance

A carefully integrated modular expansion that enhances crew welfare, public engagement and long-term adaptability for Midlands Air Ambulance.

Wernick Power Solutions generator hire at Allendale Sewage Treatment Works
Utilities

JN Bentley – Allendale Sewage Treatment Works

Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.

Events

The Grand National – RestPod Accommodation

Wernick Events supplied 43 RestPods, along with toilets, showers, and offices, to support crew welfare at the Grand National. Installed in just two days, the comfortable, en-suite units were well-received and delivered with flexibility and precision.

Specialist

Bristol Airport

Rapid-deploy modular boarding gates for Bristol Airport – efficient, high-capacity, and live-site ready.

Image of a refurbished modular building for a SEN school
Education

Expanding SEN provision with modular accommodation

Wernick Refurbished Buildings deliver classroom accommodation for an SEN provision.

Image of leisure facility of a refurbished modular building
Leisure

Supporting local sports with a 7-bay modular facility

The refurbished modular facility provides modern, accessible and functional accommodation for local sports clubs and visiting teams

Low view of the bed inside Wernick AVDanzer sleeper unit
Construction

High-quality sleeper units for Collins Earthworks

Wernick AVDanzer deliver sleeper units to Collins Earthworks