Case Studies
Caddick Construction – Stone Yard
Wernick Hire delivered a phased, four-storey AVflex modular complex for Caddick Construction at the Stone Yard development in Digbeth. The 46-bay solution, featuring a central staircase and third-floor walkway with a viewing platform, provided high-quality office and welfare facilities that evolved with the growing site team.
Tolworth Girls School
Seamless temporary accommodation delivered on time, keeping teaching and learning uninterrupted throughout essential roof replacement works.
Tilbury Douglas – Chipping Norton STW
Wernick Hire supplied a factory-finished 3 on 3 AVflex modular complex for Tilbury Douglas at Chipping Norton STW, providing branded, high-quality office and welfare space for a three-year programme. Through Wernick Hire Total, foundations, air conditioning, fire alarms, and vermin skirting were delivered as one coordinated package to ensure a streamlined installation.
Eric Wright Group – Tremeirchion Treatment Works
Wernick Hire supplied GreenSpace office and welfare accommodation for Eric Wright Group at Tremeirchion Treatment Works, delivered within one week of enquiry. The energy-efficient units supported site operations while saving 14,836.8 kWh of energy and reducing emissions by 3.07 tCO₂e over the hire period.
BAM Nuttall – River Deben Sleeping Accommodation
Wernick supplied six RestPods to BAM Nuttall for remote works on the River Deben, providing self-contained, comfortable accommodation with private showers and power. Delivered at short notice, the units and service were praised for their quality and speed.
Woodville Primary School
Wernick Hire delivered a 74-module PMflex temporary school for Woodville Primary, completing the build in just 11 weeks despite tight access and time constraints. The high-quality, fully fitted facility exceeded expectations, with all works completed by Wernick’s in-house construction team.
GR Group – Temporary Jewson Branch
Wernick Hire provided a six-unit temporary accommodation setup for Jewson’s Plymouth branch, enabling uninterrupted retail operations during refurbishment.
Eric Wright – Salford Rise
Wernick Hire delivered a 5 on 5 AVflex modular building with supporting facilities for Eric Wright’s Salford Rise project, meeting internal layout and branding standards. The setup was completed on time with ongoing support throughout the 12-month programme.
JN Bentley – Knaresborough Sewage Treatment Works
Wernick Hire supplied an 8-bay AVflex modular building for JN Bentley’s Knaresborough STW project, providing flexible office and welfare space finished in corporate livery.
Harrogate Hospital Site Accommodation
Wernick Hire delivered a bespoke three-storey FMflex modular building for Morgan Sindall at Harrogate Hospital, providing high-spec fire-rated welfare and office facilities. Despite tight site constraints, the complex was installed smoothly in a live hospital environment.
PSflex – Norfolk Energy Project
Wernick Hire supplied a PSflex modular solution for the Norfolk Energy Project, delivering high-spec office and welfare facilities with integrated battery storage for energy efficiency. Their seamless installation, strong insulation, and dedicated aftercare ensured smooth project operations.