Case studies

Education

Protected: St Philip’s School

Wernick Buildings delivered a 22-module vocational centre for St Philip’s School, providing specialist classrooms and workshops with minimal disruption and maximum sustainability.

Specialist

Protected: Bristol Airport

Education

Elmwood School

Wernick Buildings have supplied two modular classroom buildings at Elmwood School.

Southmead modular offices
HealthcareOffices

Southmead Hospital executive offices

Wernick delivered urgently needed offices to Southmead Hospital in Bristol to free up bed space before winter.

Langley School
Education

Langley School

Langley School urgently needed a dedicated space for their SEN students - learn how Wernick Buildings supported them.

All Hallows Catholic School
Education

All Hallows Catholic School

All Hallows Catholic School needed a new building to house students for their GCSE, A-level and assessment exams.

CommercialOffices

Martin Baker

Martin Baker required a brand new custom facility to replace the existing building and also wished to utilise the opportunity to also expand their office and laboratory space within their estate.

Oakleigh Depot
Offices

Oakleigh Road Depot

A new staff welfare facility was needed due to increase in operational requirements and additional staff. Dedicated service rooms are needed as the existing depot building does not provide this.

Peterborough Hospital
Healthcare

Peterborough Hospital

Peterborough Hospital expanded its estates to accommodate the winter pressures.

Education

Dinas Powys Primary School

Dinas Powys school identified a new classroom block was required to replace existing classrooms at the school.

Park Lane Exterior SEN School
Education

Park Lane SEN School

Park Lane needed a classroom and a toilet block for the expansion of their school.