Requirement

Kier Regional Civils needed a sustainable, cost-effective, and appropriate power solution for their compound located in Whaley Bridge, England. The existing on-site generator was not functioning at its optimal capacity, leading to breakdown issues and an increase in fuel and oil consumption, as well as emissions.

  • Project Name: Kier Compound, Toddbrook Reservoir
  • Sector: Infrastructure
  • Location: Whaley Bridge, England
  • Client Name: Kier Regional Civils, Infrastructure
  • Supplied by: Wernick Power Solutions
  • Products and Services: 60ka Generator, Tank 30002, MDU
  • Duration of Hire: 18 months
  • Savings: Fuel: 500+ litres p/week

Solution

Wernick Power Solutions was selected as the provider of high-quality products and flexible services. They supplied the client with a 60kva generator, a 3000L fuel tank, and a 125Amp mains distribution unit (MDU) to connect the generator’s output to the client’s equipment or premises.

The generator was equipped with the Power Solutions’ telemetry service, which allows for tracking and monitoring of fuel, oil, and water levels, as well as improved security against theft and vandalism.

Result

The client was able to save over 500 litres of fuel per week, significantly reducing costs and their carbon footprint through the use of Wernick Power Solutions’ products, specifically the generator.

The hire lasted for 18 months, during which time the client was able to rely on a sustainable and cost-effective power solution, ensuring uninterrupted operations at their compound.

Wernick Power Solutions offers excellent service with experienced operatives.

Karen Woods
Project Manager for Kier Regional Civils – Infrastructure