HS2 Old Oak Common

Requirement
As part of the HS2 high-speed railway, the first trains will operate between HS2’s new terminus in Birmingham city centre and the west London transport superhub at Old Oak Common. This state-of-the-art station will provide fast, reliable, and comfortable journeys to the Midlands, the North, and Scotland, while also offering seamless connections to central London, the West Country, and South Wales.
For this major infrastructure project, the Balfour Beatty VINCI SYSTRA joint venture (BBVS) was appointed as the Construction Partner to HS2. To support the project, BBVS required high-quality main site accommodation.
Following a successful tender process, Wernick Buildings was selected to design and deliver the accommodation.
- Project name: HS2 Old Oak Common
- Sector: Rail
- Location : London
- Supplied by: Wernick Buildings
- Size: 156 modules
- Features: 600 workstations, facilities for 1,200 operatives, a viewing platform, induction/training room, canteen area with suitable kitchen space for fully functional catering service and lift facilities to all floors
- Programme length: 42 weeks
Solution
We completed the project while fully adhering to all the stringent requirements set forth by the tier 1 contractor. Throughout the project’s duration, the company maintained a high level of transparency and accountability, ensuring a seamless collaboration with the tier 1 contractor’s team.
A critical aspect of the project’s success was Wernick Buildings’ comprehensive approach to reporting and documentation. Consistently providing detailed reports at each stage of the project, highlighting progress, key milestones, and any potential challenges that required attention. These reports facilitated clear communication and allowed all stakeholders to stay informed, fostering a collaborative environment.
We established a robust audit trail, documenting every step of the project’s lifecycle. This meticulous record-keeping allowed for easy verification and ensured compliance with all contractual and regulatory requirements. By maintaining this level of detail, the company not only met the expectations of the tier 1 contractor but also demonstrated its commitment to quality and integrity in every aspect of the project.