Colyton Grammar School
Requirement
Colyton Grammar School, known for its academic excellence, faced a significant challenge when Reinforced Autoclaved Aerated Concrete (RAAC) was discovered in one of their buildings, raising safety concerns. The school urgently needed additional, safe learning spaces after closing a classroom and toilet facility. To address these issues, the school sought a rapid deployment of high-quality modular buildings that could seamlessly integrate with their existing infrastructure.
After considering several modular building providers, Colyton Grammar School chose Wernick Hire as the preferred supplier, trusting them to deliver a solution that met their immediate needs.
- Project name: Colyton Grammar School
- Sector: Education
- Location: East Devon
- Supplied by: Wernick Hire
- Size: 10 modules
- Programme length : Phase 1 – 9 weeks, Phase 2 – 5 weeks
- Features : Science lab, prep room, drama studio, classroom, cloakroom, toilet facilities
The construction staff were incredibly polite and support, and willing to answer questions. They were a great model for our students in seeing how hard people work.