Altrad Group Limited at TATA
Requirement
When Altrad environmental acquired a new contract with TATA steel they required suitable accommodation for both their office and on-site staff as their previous temporary accommodation was no longer suitable.
The accommodation needed to be durable due to the industrial conditions of the site.
- Project name: Altrad Services site at TATA, Port Talbot.
- Sector: Industrial
- Location: TATA Steel, Port Talbot
- Client name: Altrad
- Supplied by: Wernick Hire
- Accommodation type: Two storey, AVflex® GreenSpace®
- Size: 10 Modules
- Features: Office area, Toilet area, Showering facilities, Open canteen, Kitchen area
Solution
Altrad contacted Wernick as a new client. Wernick was selected to deliver the project due to their ability to offer the client a rapid response time with a solution to their request.
The provided site accommodation consisted of a 10 module two storey product that provided, ample office space, hygiene facilities including showering and toilet areas. The facilities were installed on the outskirts of TATA steels manufacturing site.
Wernick were transparent and efficient with their aftercare which exceeded the clients’ expectations. Altrads occupying staff for the duration of the contract were also impressed with the high quality and durability of their new accommodation.
This is the first time Altrad have used Wernick Hire; this is also the first time we have hired a modular building. The service and quality of the product we have received from Wernick has been timely and exceeded not only my expectations but also our members of staff.
The excellent after care and quality product we have received have been the defining factor on my recommendations to other companies seeking temporary accommodation solutions