Case studies
We have over 90 years proven success delivering projects over many sectors.
GR Group – Temporary Jewson Branch
Wernick Hire provided a six-unit temporary accommodation setup for Jewson’s Plymouth branch, enabling uninterrupted retail operations during refurbishment.
Additional classroom space for The Malling School
The Malling School required additional classroom space for their growing school. Wernick were able to deliver a classroom building made up of 12 modules.
Eric Wright – Salford Rise
Wernick Hire delivered a 5 on 5 AVflex modular building with supporting facilities for Eric Wright’s Salford Rise project, meeting internal layout and branding standards. The setup was completed on time with ongoing support throughout the 12-month programme.
JN Bentley – Knaresborough Sewage Treatment Works
Wernick Hire supplied an 8-bay AVflex modular building for JN Bentley’s Knaresborough STW project, providing flexible office and welfare space finished in corporate livery.
Temporary teaching facilities at Francis Barber
Wernick delivered a refurbished modular classroom block to the school for a hire period of 75 weeks while a new brick-built school is being constructed.
St Katherines School
St Katherines School, a popular academy and nursery located in Harlow, required immediate temporary power and accommodation due to a RAAC issue.
Between the Bridges
Wernick Events provided a compact, well-coordinated site accommodation setup for Between The Bridges on London’s Southbank, including double-stacked cabins, public toilets, and storage. Careful logistics ensured smooth delivery in a restricted, high-profile location for the fifth consecutive year.
Harrogate Hospital Site Accommodation
Wernick Hire delivered a bespoke three-storey FMflex modular building for Morgan Sindall at Harrogate Hospital, providing high-spec fire-rated welfare and office facilities. Despite tight site constraints, the complex was installed smoothly in a live hospital environment.
PSflex – Norfolk Energy Project
Wernick Hire supplied a PSflex modular solution for the Norfolk Energy Project, delivering high-spec office and welfare facilities with integrated battery storage for energy efficiency. Their seamless installation, strong insulation, and dedicated aftercare ensured smooth project operations.


















