Load banks
A comprehensive service to verify the reliability and performance of your generators and UPS. Offers precise testing and calibration for optimal performance.
Engineered for reliability and resilience
Ensure your backup power is ready when you need it most with regular load bank testing. Our comprehensive service simulates real-world load conditions to verify the reliability and performance of your generators and UPS systems, giving you peace of mind and helping to prevent costly downtime.
What is a load bank test?
A load bank test is a preventative maintenance procedure that simulates real-world demands on your backup power system, such as generators and UPS units. Imagine it like a stress test for your backup power.
By applying a controlled load to the system, we can assess its ability to deliver the required power output, voltage stability, and frequency under actual operating conditions. This helps identify any potential weaknesses or areas for improvement before a real power outage strikes.
A load bank test can ensure your backup power is ready to kick in seamlessly when needed, protecting your critical operations and saving you from costly downtime.
Key features of our load banks
- Variable load simulation: Simulate loads from 1% to 110% for a comprehensive generator test.
- Robust security: Canopy with lockable doors provides additional security, especially in vulnerable areas.
- Versatile load options: Offers resistive or reactive single and three-phase load options for flexibility.
- Easy transport: Road towable options for enhanced site-to-site flexibility.
- Calibrated accuracy: Regular calibration ensures accurate and precise test results.
- Engineer support: Available with an expert engineer or as a standalone hire package for convenience.


Learn about net zero 2040

HV Upgrade – Lancashire
The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.
HV Upgrade – Lancashire
The client required temporary power for six machinery control centres whilst the mains power was isolated to allow a HV upgrade. Wernick Power Solutions provided a tailored solution that ensured uninterrupted operation of all MCCs throughout the HV upgrade, allowing works to proceed without delay.

JN Bentley – Allendale Sewage Treatment Works
Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.
JN Bentley – Allendale Sewage Treatment Works
Allendale Sewage Treatment Works required a reliable temporary power solution while awaiting a permanent mains power connection. Wernick Power Solutions took over full responsibility for powering the site, designing a resilient and fail-safe temporary power setup tailored to the site’s critical nature.




















