Tilbury Douglas – Chipping Norton STW
Requirement
Tilbury Douglas required a high-quality modular accommodation solution to support long-term works at Chipping Norton Sewage Treatment Works. As a key infrastructure project within the utilities sector, the site needed reliable, secure office and welfare facilities to accommodate the project team over a three-year programme.
As an established SLA customer, Tilbury Douglas sought a solution that met their operational standards, corporate branding requirements, and programme timeline. The building needed to provide a professional working environment, with internal layouts configured in line with project drawings and external finishes matching company livery.
- Project name: Chipping Norton Sewage Treatment Works
- Location: Chipping Norton, Oxfordshire
- Sector: Utilities / Infrastructure
- Client: Tilbury Douglas
- Programme Length: 3 Years
- Wernick Hire Total: Foundations, Air conditioning, Fire alarm systems, Vermin skirting
Solution
Wernick Hire supplied a 3 on 3 AVflex, manufactured and delivered directly from the factory for this project, ensuring a high-quality finish from day one.
Internally, the accommodation was configured to Tilbury Douglas’ specific layout requirements, creating practical and efficient office and welfare space for the duration of the works.
Externally, the building was finished in Tilbury Douglas’ corporate colours with mid-band detailing and access ramps, creating a professional site presence aligned with company branding.
As part of the project, Wernick delivered a fully integrated solution through Wernick Hire Total, incorporating:
-
Foundations to support the modular complex
-
Air conditioning to maintain a comfortable internal environment
-
Fire alarm systems for site safety compliance
-
Vermin skirting to protect the underside of the building
By managing these elements as part of one coordinated package, Wernick Hire ensured streamlined delivery, simplified communication, and consistent quality control throughout the installation.
The result is a durable, professional site accommodation complex designed to support Tilbury Douglas throughout the full three-year programme.