Back

Celtic Link Ferries

When Port of Liverpool based Celtic Link Ferries (CLF) needed an office space solution Wernick Refurbished Buildings acquired a 2-bay modular building specifically for refurbishment to their client’s requirements. The CLF brief specified a meeting room, an open plan office area, a ticket sales window and both staff and public toilet facilities.

Additionally, CLF also required an 8’ x 8’ (2.4m x 2.4m) gatehouse which WRB selected to convert from their extensive stock of reconditioned modular buildings available for hire or purchase.

CLF is a new roll-on, roll-off freight ferry terminal operating between Liverpool and Dublin and Ray Dawson the terminal manager had a six week leadtime to get the new business up and running. “I know that the team at Wernick Refurbished Buildings worked around the clock, including a bank holiday, to ensure that my project timescales were met,” explained Mr Dawson. “I had some basic designs for the buildings which WRB  accurately converted into CAD drawings and I have to say that I am extremely impressed with the overall quality of build.”

CLF designed the reception office specifically for in-gating and out-gating drop trailer and driver accompanied vehicles. The office accommodation has been designed with enough space to cope with future expansion plans.

“Wernick Refurbished Buildings proved their adaptability and flexibility in supplying me with exactly what I needed, on time,” commented Mr Dawson. “Nothing was too much trouble for the team to deal with.”

Click here for more information on our portable cabins.